North–South Commuter Railway (NSCR) Complete Stations Guide: Ultimate Navigation Resource
Table of Contents
The North-South Commuter Railway (NSCR) is an ambitious railway project that aims to enhance connectivity across Luzon, Philippines. Stretching from Clark to Calamba, this rail system is poised to transform daily commutes in Metro Manila and beyond. With plans to feature 36 stations, the NSCR will connect key urban centers, making transportation more efficient for commuters.
NCSR San Fernando City Station photo via DOTR
This railway line will serve as a significant upgrade to the existing Philippine National Railway services. It is designed to reduce travel times and improve the quality of public transportation. The strategic location of stations ensures that important economic zones such as Clark are easily accessible.
Once complete, the project will provide a much-needed alternative to road travel in heavily congested areas like Metro Manila. It promises not only to ease traffic but also to boost economic activities in connected cities and towns. This guide will take you through the planned stations, highlighting each location’s significance.
NCSR Apalit Station photo via DOTR
NCSR Calumpit Station photo via DOTR
NCSR Clark Station photo via DOTR
NCSR Angeles Station photo via DOTR
NCSR Blumentritt Station photo via DOTR
Overview of the NSCR Project
The North–South Commuter Railway (NSCR) is a significant railway project in the Philippines. The project is under the supervision of the Department of Transportation (DOTr) and is aimed at improving commuter transit in the Greater Manila Area.
Funded by the Japan International Cooperation Agency and the Asian Development Bank, the project will reduce traffic congestion in Manila. The railway extends approximately 148 kilometers, connecting key cities in Luzon, from Clark in the north to Calamba in the south.
The project includes several components such as civil works, railway tracks, and electrical and mechanical systems. It also encompasses the construction of bridges and other infrastructure to support the railway.
Phase 1 of the NSCR stretches from Malolos to Tutuban. This phase is designed to serve daily commuters, potentially aiding over 200,000 people every day.
Partners like CPCS Transcom are involved in planning and executing parts of the project to ensure its timely completion. The North-South Commuter Railway remains a vital step towards modernizing the country’s transportation infrastructure.
Stations of the NSCR
The North–South Commuter Railway (NSCR) connects several key regions, enhancing travel across Metro Manila and the neighboring provinces. It features important stations like Tutuban Central, Malolos City, Clark International Airport, and Calamba Terminus.
Tutuban Central Station
Tutuban Central Station serves as a vital hub in Manila. Located in the historic district, it links various modes of transportation. Its strategic position in Tondo ensures easy access to shopping and business areas. The station is designed to handle high volumes of passengers, accommodating commuters efficiently. It also connects with other transit lines, facilitating travel across the city and beyond. The bustling surrounding area offers numerous amenities for travelers.
Malolos City Hub
Situated in Bulacan, Malolos City Hub supports the regional transit flow. It connects the northern provinces to Manila, easing the daily commute for many. As an important station, it enhances accessibility for residents and businesses alike. The station plays a key role in reducing traffic congestion on the roads. Its development aims to boost local economies by linking commercial centers and residential areas more effectively.
Clark International Airport Access
The station at Clark International Airport in Pampanga offers seamless transit options for air travelers. Its location within the Clark Freeport Zone facilitates convenient access to the airport. This station is crucial for both domestic and international passengers. It also connects various transportation modes, providing greater travel flexibility. With modern facilities, it enhances the overall travel experience. The station supports efforts to decentralize economic activities outside Metro Manila.
Calamba Terminus
Calamba Terminus is located in Laguna and marks the southern end of the NSCR. It plays a crucial role in connecting the southern Luzon provinces to Manila. This terminus enhances the accessibility of suburban areas, supporting commuters traveling to the capital. It is a key link for people living in Laguna and other nearby regions. The station’s development is set to improve regional growth and connectivity. The terminus helps ease traffic on major roads, improving travel efficiency.
NCSR Espana Station photo via DOTR
NCSR Sta Mesa Station photo via DOTR
NCSR Paco Station photo via DOTR
Key Destinations and Connectivity
The North–South Commuter Railway (NSCR) is designed to enhance connectivity across several key regions in the Philippines. It promises a swift journey through Metro Manila, Central Luzon, and Calabarzon, with significant integration into the Greater Manila Area.
Metro Manila Integration
In Metro Manila, the NSCR seamlessly connects with existing transport systems, bolstering the city’s public transit network. A crucial integration point is the planned connection with the upcoming Metro Manila Subway. This linkage allows for smoother travel transitions and reduces congestion in major hubs like Makati.
The NSCR further includes stations in vital areas such as Buendia, which are pivotal for daily commuters. By integrating with various transit routes, it is set to facilitate easier and faster travel across the bustling metropolis, benefiting residents and visitors alike.
Central Luzon and Calabarzon Linkage
The NSCR extends its reach into Central Luzon, enhancing accessibility to this rapidly developing region. The railway connects cities like Clark, which hosts a significant economic zone and the Clark International Airport. This linkage is instrumental in cutting down travel time between these areas and Metro Manila.
The railway also serves Calabarzon, a key industrial region. By providing a direct rail link, the NSCR helps in easing logistics and commuter movement, thereby supporting regional economic growth. With these connections, the NSCR plays a crucial role in transforming the regional transport landscape.
Greater Manila Area Extension
Further extending the rail network into the Greater Manila Area, the NSCR offers new commuting options. Its stations strategically placed in suburban areas are set to decongest urban transport while providing a reliable alternative for daily travel.
Additionally, the NSCR’s extension enhances connectivity with other major transit lines, ensuring that even those living on the outskirts have access to efficient transport. This development is expected to encourage more people to opt for public transit, alleviating road traffic and contributing to sustainable urban growth.
NCSR Buendia Station photo via DOTR
NCSR Nichols Station photo via DOTR
NCSR FTI Station photo via DOTR
NCSR EDSA Station photo via DOTR
NCSR SUCAT Station photo via DOTR
NCSR Blumentritt Station Platform Area photo via DOTR
NCSR Muntinlupa Station photo via DOTR
NCSR Alabang Station photo via DOTR
NCSR Pacita Station photo via DOTR
NCSR San Pedro Station photo via DOTR
NCSR Binan Station photo via DOTR
NCSR Sta Rosa Station photo via DOTR
NCSR Cabuyao Station photo via DOTR
NCSR Calamba Station photo via DOTR
NCSR Banlic Station photo via DOTR
NSCR Complete List of Stations:
- New Clark City
- Clark International Airport
- Clark
- Angeles
- San Fernando
- Apalit
- Calumpit
- Malolos
- Guiguinto
- Balagtas
- Bocaue
- Marilao
- Meycauayan
- West Valenzuela
- Caloocan
- Solis
- Tutuban
- Bluementritt
- Espana
- Santa Mesa
- Paco
- Buendia
- EDSA
- Senate-DepED
- FTI
- Bicutan
- Sucat
- Alabang
- Muntinlupa
- San Pedro
- Pacita
- Binan
- Santa Rosa
- Cabuyao
- Banlic
- Calamba
Travel Time and Efficiency
The North-South Commuter Railway (NSCR) aims to improve travel between key areas in the Philippines. This project significantly reduces travel time, making daily commuting more efficient.
For instance, travel between Malolos and Tutuban is approximately 35 minutes at a maximum speed of 120 km/h. Trains are expected to run with headways of about 6 minutes. This efficiency provides a reliable alternative for daily commuters.
The project includes important components like the Malolos-Clark Railway Project and the Clark–Calamba Railway. These components enhance connectivity across regions, linking urban and rural areas effectively.
A vital part of the project is the Airport Express Train, offering a quick link between central hubs and the airport. By cutting the travel time significantly, the Airport Express Train provides an efficient option for travelers.
The MCRP and NSCR work together to handle about 800,000 commuters daily. Together, they provide a cheaper, reliable transportation option, particularly useful for those traveling longer distances.
This railway network fosters connectivity while helping reduce congestion. It plays a crucial role in transforming travel in the Philippines, offering a sustainable transportation solution for the expanding urban regions.
Operational Aspects
The North-South Commuter Railway (NSCR) project is a significant development in the Philippines, focusing on both partial operations and full system completion. It’s essential to consider the role of maintenance in ensuring smooth operations. Depots are another crucial aspect, serving as hubs for maintaining the trains and infrastructure.
Partial Operation Stages
The NSCR project will begin with partial operation stages, where certain sections of the railway will open before the entire system is complete. This gradual implementation is designed to offer commuters faster travel options while full infrastructure is still under construction.
Initially, the line connecting Malolos to Tutuban in Manila will be available. As more segments are finalized, additional stations will become operational. This approach allows for testing and adjustments, enhancing safety and efficiency.
By incrementally opening sections of the railway, authorities can monitor and fix any issues, ensuring a reliable service. This phased approach will provide early benefits to passengers and help build public trust in the system.
Full System Completion
Full operation of the NSCR is targeted for December 2027. Once complete, the railway will extend from Clark in the north to Calamba in the south. This full system is expected to significantly enhance regional connectivity.
It will reduce travel times and make daily commutes more comfortable. The completion will integrate different transport modes, connecting several urban centers and providing convenient links to Clark International Airport.
When fully operational, the rail network will have increased capacity, supporting economic activities and movement between Central Luzon and CALABARZON. The extensive reach of the railway will cater to a growing population, addressing transit needs effectively.
Maintenance and Depots
Maintenance is critical for reliable railway service. The NSCR will include specialized depots for train storage, inspection, and repairs. These facilities will play a vital role in ensuring the system operates smoothly and safely.
Depots are strategically positioned along the line, equipped to handle various maintenance tasks. Regular upkeep will be crucial to deal with issues that can arise from daily operations and environmental factors.
Right of Way discipline is crucial for maintenance, keeping tracks and areas clear for safe train passage. Proper planning and resources will sustain infrastructure quality, allowing trains to run efficiently with minimal disruptions.
Infrastructure Development
The North-South Commuter Railway (NSCR) is a major infrastructure project in the Philippines aimed at improving public transportation. It incorporates various phases and integrates with other key transport initiatives to enhance connectivity across regions.
PNR Clark Phase 1
PNR Clark Phase 1 is a crucial segment of the NSCR, extending from Tutuban in Manila to Malolos, Bulacan. This phase is expected to significantly reduce travel time for commuters traveling between these areas. Construction involves advanced Civil Works and involves significant stakeholders like Sumitomo Corporation. The development aims to accommodate increased passenger capacity and boost accessibility to New Clark City.
The project is driven by a Public-Private Partnership (PPP) model, engaging both government and private entities. This collaboration ensures effective project management and timely delivery, while also addressing urban congestion concerns. Enhanced commuter experiences are a key focus of infrastructure improvements in this phase.
NSCR Project Phases
The NSCR Project is structured in multiple phases, each targeting specific infrastructure and connectivity improvements. Beyond PNR Clark Phase 1, the project extends to the Malolos-Clark section, known as Phase 2. This includes Hitachi Rail as a major contributor, working to establish a high-speed train service. By extending the railway to Calamba, Laguna, the project provides a seamless link across key regions.
These phases focus on delivering a world-class commuter service with improved technology and operational efficiency. Emphasizing sustainable infrastructure, the NSCR project aims to meet future transportation demands while mitigating environmental impact.
Integration with Other Projects
Integration with existing and planned projects is critical for the NSCR’s success. It aligns closely with the Metro Manila Subway Project to create a cohesive transportation network. This integration streamlines transit options and reduces travel times across Metro Manila and beyond.
Interconnectivity with other transportation modes enhances commuter convenience and reflects a strategic approach to infrastructure development. Collaborative efforts among stakeholders like Hitachi Rail and Sumitomo Corporation ensure cohesive planning and implementation, maximizing the benefits of these transport initiatives. Through this holistic approach, the NSCR sets the foundation for future urban transport solutions.
Economic and Societal Impact
The North-South Commuter Railway (NSCR) in the Philippines plays a key role in economic growth. By offering reliable transport, it boosts access to jobs and businesses, helping local economies thrive. This railway project, supported by the Asian Development Bank, aims to reduce road congestion and decrease emissions, aligning with the country’s climate goals.
The Department of Transportation is heavily involved in this endeavor. Its implementation can lead to significant employment opportunities, from construction jobs to long-term positions in operations and maintenance. Economic development is further supported through enhanced connectivity between key cities, promoting urban growth and regional integration.
Access to a fast and efficient rail service can lower commuting times. This allows people to spend more time on productive activities or with family. The societal benefits include improved quality of life and greater social mobility. Additionally, the project aims to connect densely populated areas, addressing the need for urban transportation solutions.
By creating seamless links between areas, the NSCR promises to deliver substantial social benefits. It offers affordable and efficient travel, which can help bridge gaps between different economic groups. This contributes to a more inclusive society, where more people can access opportunities and services.
The NSCR is also expected to stimulate urban development. Enhanced rail services can encourage businesses to expand along the route, providing a stable environment for commercial investments. With its completion, the railway is seen as a backbone for regional development.
Technical Specifications
The North-South Commuter Railway (NSCR) in the Philippines, designed by various industry experts, integrates advanced features for efficiency and safety. Details such as rolling stock capabilities and the railway’s safety measures are crucial for understanding its functionality.
Rolling Stock and Features
The NSCR employs rolling stock from Hitachi Rail, designed for reliability and efficiency. These train sets operate on standard gauge tracks, enhancing stability and ride comfort. Each train is equipped with modern amenities including air-conditioning, ergonomic seating, and digital displays for passenger information.
The trains’ energy efficiency is notable, as they utilize regenerative braking systems to lower energy consumption. Designed to handle high-frequency operations, these train sets can accommodate large numbers of commuters, reducing congestion in the bustling Greater Manila Area. The choice of materials ensures durability and minimal maintenance, promising a long lifespan.
Railway Safety and Signaling
Safety is a paramount aspect of the NSCR. The Philippine National Railways (PNR) ensures comprehensive safety protocols are in place. Advanced signaling systems, compatible with international standards, guide train movements, decreasing the likelihood of errors and accidents.
Automatic Train Protection (ATP) is a key component, enforcing adherence to speed limits and operational commands. Emergency features, such as quick halting mechanisms and secure passenger exits, further enhance safety. Surveillance cameras installed in carriages and stations monitor and prevent security threats, maintaining the well-being of passengers at all times. These technical specifications reflect a commitment to safety and efficiency in urban transit systems.
Commuter Services
The North-South Commuter Railway (NSCR) provides two main options for commuters: a regular service that connects various key locations and a specialized express service for airport travel. These services aim to improve transit times and offer a reliable alternative for people traveling within the Greater Manila Area.
Regular Commuter Service
The regular commuter service on the NSCR is designed to handle high passenger volumes efficiently. It connects areas such as PNR Clark Phase 1 and PNR Calamba. Multiple stations, including Balagtas Station, are strategically placed to serve different communities.
Services run frequently, ensuring short wait times for passengers. The trains are modern and equipped with safety features to enhance passenger comfort. This service primarily targets everyday commuters who travel for work or education, providing a sustainable travel option. Discounts are available for students, seniors, and persons with disabilities.
Airport Railway Express Service
The Airport Railway Express Service offers a faster connection to the airport, significantly reducing travel time from areas such as Makati to Clark International Airport. Designed for convenience, it caters to air travelers who need a reliable and quick way to reach the airport.
This service focuses on speed, with fewer stops and priority scheduling to ensure timely arrivals. Passengers can expect comfortable seating and ample luggage space. Tickets are priced competitively, making it an attractive option for both local and international travelers. The service aims to ease congestion at road-based airport routes while offering punctuality and efficiency.
Future Development and Expansion
The North-South Commuter Railway (NSCR) is set to grow beyond its current routes with plans for extensions and integration with other rail networks like the Mindanao Railway. These plans aim to enhance connectivity and efficiency across the region.
Planned Extensions
The NSCR’s planned extensions focus on connecting more regions within Luzon. This includes extending lines to further integrate into the Greater Manila Area and beyond. By expanding to new areas, travel between key locations like Buendia, Clark, and Calamba will become easier.
These plans enhance the existing North-South Railway Project. The goal is to reduce travel time significantly, providing a faster commuter service for residents and travelers. Developing new stations and upgrading facilities will offer a more comfortable and efficient journey for passengers.
Integration with Mindanao and Other Railways
Plans exist to connect the NSCR with the proposed Mindanao Railway. This will help unify the country’s rail systems and make travel between Luzon and Mindanao smoother.
Integration with existing systems like the Light Rail Transit (LRT) and Metro Rail Transit (MRT) is also essential. This aims to create a seamless transition for passengers traveling across different networks. These connections will boost economic growth by facilitating better access for people and goods to move efficiently across regions.
Frequently Asked Questions
The North-South Commuter Railway (NSCR) is a significant transportation project in the Philippines. Below are answers to common questions about completed stations, maps, project timelines, details, and impacts on existing systems.
What are the completed stations for the North-South Commuter Railway as of the latest update?
As of the latest update, the North-South Commuter Railway (NSCR) project is still under construction and has not yet reached full completion. However, significant progress has been made. According to a report from ABS-CBN, the stations in the northern line are between 80% to 90% completed, but none have been fully completed yet. The overall project is expected to start partial operations by 2026 and aims for full completion by 2029.
Where can I find a detailed map of the North-South Commuter Railway?
You can find a detailed map of the North-South Commuter Railway on the official project page of the North South Commuter Railway Extension Project here. This map provides the locations of various stations along the route from Clark in the north to Calamba in the south. Additionally, the Rappler website also offers a comprehensive map that includes the 37 planned stations across Tarlac, Pampanga, Bulacan, Metro Manila, and Laguna.
What is the expected completion date for the entire North-South Commuter Railway project?
The entire North-South Commuter Railway (NSCR) project is expected to be completed by 2029. Partial operations for some sections of the railway are anticipated to begin as early as 2026, with further segments opening in stages leading up to the final completion date. For example, the Malolos-Clark section is expected to be completed by June 2025, while the Clark-Valenzuela segment is projected to open in the first quarter of 2028.
What are the project details for the North-South Commuter Railway Phase 2?
The North-South Commuter Railway (NSCR) Phase 2 involves the extension of the railway from Malolos in Bulacan to Clark in Pampanga. This phase is a critical component of the overall NSCR project, aiming to enhance connectivity and alleviate traffic congestion in the Greater Capital Region.
Here are some key details about Phase 2:
- Route and Length: Phase 2 covers approximately 53 kilometers, extending from Malolos to Clark International Airport. This segment will facilitate faster travel between Central Luzon and Metro Manila.
- Stations: The extension will include several new stations, such as Calumpit, Apalit, San Fernando, Angeles, Clark, and Clark International Airport. These stations are designed to improve accessibility and convenience for commuters.
- Design and Infrastructure: The railway will feature a double-track system with a design speed of 160 km/h for passenger trains and 120 km/h for freight trains. The infrastructure will include elevated viaducts, at-grade sections, and underground segments, particularly near the airport,
- Funding and Support: The project is supported by various international agencies, including the Japan International Cooperation Agency (JICA) and the Asian Development Bank (ADB). JICA and ADB have provided significant financial assistance to ensure the project’s successful implementation.
- Completion Timeline: Phase 2 is part of the broader NSCR project, which is expected to be fully operational by 2029. However, partial operations for some sections, including parts of Phase 2, are anticipated to begin by 2026.
For more detailed information, you can refer to the project’s official documentation and updates from involved agencies like JICA and ADB.
How will the NSCR impact the current transportation system in the area it serves?
The North-South Commuter Railway (NSCR) Phase 2 involves the extension of the railway from Malolos in Bulacan to Clark in Pampanga. This phase is a critical component of the overall NSCR project, aiming to enhance connectivity and alleviate traffic congestion in the Greater Capital Region.
Here are some key details about Phase 2:
- Route and Length: Phase 2 covers approximately 53 kilometers, extending from Malolos to Clark International Airport. This segment will facilitate faster travel between Central Luzon and Metro Manila.
- Stations: The extension will include several new stations, such as Calumpit, Apalit, San Fernando, Angeles, Clark, and Clark International Airport. These stations are designed to improve accessibility and convenience for commuters.
- Design and Infrastructure: The railway will feature a double-track system with a design speed of 160 km/h for passenger trains and 120 km/h for freight trains. The infrastructure will include elevated viaducts, at-grade sections, and underground segments, particularly near the airport (source).
- Funding and Support: The project is supported by various international agencies, including the Japan International Cooperation Agency (JICA) and the Asian Development Bank (ADB). JICA and ADB have provided significant financial assistance to ensure the project’s successful implementation (source).
- Completion Timeline: Phase 2 is part of the broader NSCR project, which is expected to be fully operational by 2029. However, partial operations for some sections, including parts of Phase 2, are anticipated to begin by 2026.
For more detailed information, you can refer to the project’s official documentation and updates from involved agencies like JICA and ADB.
How will the NSCR impact the current transportation system in the area it serves?
The North-South Commuter Railway (NSCR) is expected to significantly impact the current transportation system in the areas it serves by providing a more efficient, reliable, and sustainable mode of transport. Here are some of the key impacts:
- Reduced Traffic Congestion: The NSCR will help alleviate traffic congestion on major roads and highways in Metro Manila and surrounding provinces by providing a viable alternative to road transport. This is particularly important in highly congested areas such as Metro Manila, where daily commutes can be extremely time-consuming.
- Improved Connectivity: The NSCR will enhance connectivity between key urban centers and suburban areas. By linking regions like Clark, Pampanga, Bulacan, Metro Manila, and Laguna, it will facilitate easier and faster travel for commuters, thereby promoting economic activities and regional development.
- Environmental Benefits: By shifting a significant number of commuters from road to rail, the NSCR will contribute to reduced greenhouse gas emissions and lower air pollution levels. Rail transport is generally more energy-efficient and environmentally friendly compared to car and bus travel.
- Economic Growth: The improved transportation network is expected to spur economic growth by making it easier for people to access jobs, education, and services. It will also likely attract investments in real estate and commercial developments around the new stations, further boosting local economies.
- Enhanced Public Transport Integration: The NSCR will integrate with other public transport systems, such as the Metro Rail Transit (MRT), Light Rail Transit (LRT), and bus services, creating a more cohesive and efficient public transport network. This integration will help streamline travel and reduce the overall travel time for commuters.
- Increased Property Values: Areas surrounding the NSCR stations are likely to see an increase in property values due to improved accessibility and the convenience of having a major transport hub nearby. This can lead to urban renewal and development in these regions.
- Job Creation: The construction and operation of the NSCR will create numerous job opportunities in various sectors, including construction, engineering, operations, and maintenance. This will have a positive impact on the local job market and economy.
Overall, the NSCR is expected to bring about transformative changes to the transportation landscape in the regions it serves, enhancing the quality of life for residents and contributing to sustainable urban development.
What are the projected costs and financing models for the North-South Commuter Railway?
The North-South Commuter Railway (NSCR) project has substantial projected costs and employs various financing models to ensure its successful implementation. Here are the key details:
Projected Costs
- Total Cost: The overall cost of the NSCR project is estimated to be approximately P873.62 billion (around $17.4 billion USD).
- Phase-Specific Costs: The extension from Malolos to Clark (Phase 2) alone is projected to cost around P149 billion (approximately $3 billion USD).
Financing Models
- Multilateral Development Banks: Significant funding is provided by international financial institutions such as the Japan International Cooperation Agency (JICA) and the Asian Development Bank (ADB). For instance, JICA and ADB have committed large loans to support the project. ADB has signed a $2.75 billion loan agreement to fund the Malolos-Clark Railway Project, which is part of the broader NSCR initiative (source).
- Public-Private Partnerships (PPPs): The project also leverages PPP models for various aspects, such as operations and maintenance. This approach helps distribute the financial burden and risks between the government and private sector partners. The PPP Center of the Philippines lists the NSCR as one of its key projects under the PPP framework (source).
- Government Funding: The Philippine government has allocated significant budgetary resources to support the NSCR. For instance, the 2024 national budget includes Php76.34 billion (approximately $1.5 billion USD) specifically for the NSCR to keep the project on schedule.
- Official Development Assistance (ODA): Besides loans from JICA and ADB, the project may also receive other forms of ODA, which typically come with favorable terms such as low-interest rates and long repayment periods.
Summary
The NSCR project employs a combination of multilateral loans, PPPs, government budget allocations, and possibly other forms of ODA to cover its substantial costs. This diversified financing approach aims to mitigate financial risks and ensure the project’s successful completion, ultimately enhancing the transportation infrastructure in the Greater Capital Region of the Philippines.
Follow and Subscribe to OutofTownBlog.com on Facebook, Twitter, Instagram, Pinterest, and YouTube for more Travel related updates.
Read:
.essb_links.essb_size_l .essb_link_svg_icon svg{height:20px;width:auto}.essb_links.essb_size_l .essb_icon{width:42px !important;height:42px !important}.essb_links.essb_size_l .essb_icon:before{font-size:20px !important;top:11px !important;left:11px !important}.essb_links.essb_size_l li a .essb_network_name{font-size:14px !important;font-weight:400 !important;line-height:12px !important}
Appeared first on: outoftownblog.com